Category: | A track or path other than a cycleway mainly for walking: A problem that needs to be fixed |
Tags: | covid-19 |
Date time: | 5.57pm, Monday 29th June, 2020 |
Time line: | Earlier | Later |
Facing: | Unknown |
Added by: | widenmypath |
Copyright: | Public domain |
Area: | Hatfield |
Rephase lights so the green phase is in synch with the green phase around the roundabout. Red phase is far too long.
Comments reflect the views of the original submitter only.